Main Article Content
Abstract
One of the molding injection Komatsu 80T in the PT Yogya Presisi Teknikatama Industry has a problem on its performance. The performance of this injecton molding can be calculated by Overall Equipment Effectiveness(OEE). OEE is a factor which can be found by multiplication of Availability Ratio, Performance Efficiency and Rate of Quality. The values of OEE then be compared to the standart values of JIPM (The Japan Institute of Plan Maintenance) which JIPM defined a minimal standard value of OEE is 85%. If the result of OEE calculation less than 85%,what causes it be analysed by the Six Big Losses Analysis. The Result of analysis showed the sequence as Reduced Speed Loss, Setup and Adjusmnet loss, and Rework Loss. Then by Fishbone diagram, it can be known the causes of the decreasing OEE values, so the management can do the repairment.
Article Details
License
Authors who publish with this journal agree to the following terms:
- Authors retain copyright and grant the journal right of first publication with the work simultaneously licensed under a Creative Commons Attribution License that allows others to share the work with an acknowledgement of the work's authorship and initial publication in this journal.
- Authors are able to enter into separate, additional contractual arrangements for the non-exclusive distribution of the journal's published version of the work (e.g., post it to an institutional repository or publish it in a book), with an acknowledgement of its initial publication in this journal.
- Authors are permitted and encouraged to post their work online (e.g., in institutional repositories or on their website) prior to and during the submission process, as it can lead to productive exchanges, as well as earlier and greater citation of published work (See The Effect of Open Access).