[1]
Sigit, A. 2019. OPTIMALISASI BIAYA DAN WAKTU PROYEK MENGGUNAKAN METODE CRASHING DENGAN PENAMBAHAN WAKTU KERJA (LEMBUR) DAN SISTEM KERJA SHIFT. Teknisia. 23, 2 (May 2019), 505–515.