[1]
A. Sigit, “OPTIMALISASI BIAYA DAN WAKTU PROYEK MENGGUNAKAN METODE CRASHING DENGAN PENAMBAHAN WAKTU KERJA (LEMBUR) DAN SISTEM KERJA SHIFT”,
Teknisia
, vol. 23, no. 2, pp. 505–515, May 2019.