Sigit, Adityawan. “EVALUASI BIAYA DAN WAKTU PADA PROYEK PENGGANTIAN JEMBATAN DENGAN MENGGUNAKAN METODE KONSEP NILAI HASIL”. Teknisia 24, no. 2 (November 30, 2019): 117–125. Accessed November 21, 2024. https://journal.uii.ac.id/teknisia/article/view/13997.