Main Article Content

Abstract

The increasingly high development in Indonesia has spurred the number of construction service companies to increase. On the other hand, the increase in the growth of construction service companies has not been accompanied by a good atmosphere of construction implementation. As a result, delays in completing work have become commonplace in construction projects in Indonesia, the eastern part, and especially Papua. This research investigated the factors causing delays in completing construction work in Papua Province, especially in Merauke Regency. Questionnaires were distributed to contractors registered as members of GAPEKSINDO and domiciled in the Merauke district. The purposive sampling technique took the number of samples. The data analysis in this research used a Non-Parametric Statistical Test with Kendall's W analysis using SPSS 25.0 for the Windows program. The seven main factors that cause construction project delays are related to consultants. The test results show that the main factor of delay in construction projects in the Merauke Regency is the labor factor, with a mean rank value of 2.56. Factors that do not affect construction delays are other factors with a mean rank value of 5.28.

Keywords

Delay factors non-Parametric statistic Kendall’s W test Delay factors non-Parametric statistic Kendall’s W test

Article Details

Author Biography

Anggara Hutahaen, Departemen Teknik Sipil dan Lingkungan, Universitas Gadjah Mada, Yogyakarta, Indonesia

Perkenalkan saya Anggara hutahaean mahasiswa Pascasarjana Universitas Gadjah Mada 
jurusan Magister Teknik Sipil dan Bangunan dengan dosen pembimbing saya Bapak Arief Setiawan Budi Nugroho selaku dosen pembimbing pertama dan Bapak Muslikh sebagai dosen pembimbing kedua saya

How to Cite
Hutahaen, A., Budi Nugroho, A. S., & Muslikh. (2022). FAKTOR – FAKTOR KETERLAMBATAN PROYEK KONSTRUKSI DI PAPUA. Teknisia, 27(1), 1–11. https://doi.org/10.20885/teknisia.vol27.iss1.art1

References

  1. Agritama, R., Huda, M., & Setiyo Rini, T. (2018). "Faktor-Faktor Yang Mempengaruhi Keterlambatan Proyek Konstruksi Di Surabaya". Jurnal Rekayasa Dan Manajemen Konstruksi, 6(1), 25–32.
  2. anna margareta andreana malir, dirani sudarwadi, y heri saptomo. (2018). Faktor - faktor Penyebab Keterlambatan Pelaksanaan Pekerjaan Proyek Kontruksi di Kabupate Manokwari. Cakrawala, 1.
  3. Aziz, R. F. (2013). Ranking of delay factors in construction projects after Egyptian revolution. Alexandria Engineering Journal, 52(3), 387–406. https://doi.org/10.1016/j.aej.2013.03.002
  4. Bakhtiyar, A., Soehardjono, A., & Hasyim, M. H. (2012). Analisis faktor-faktor yang mempengaruhi keterlambatan proyek konstruksi pembangunan gedung di kota lamongan. Jurnal Rekayasa Teknik Sipil, 6(1), 55–66.
  5. Delays, T. H. E., In, F., The, F., Constructions, B., & Region, K. (2019). Faktor-Faktor Penyebab Keterlambatan Penyelesaian Proyek Gedung Di Kabupaten Karangasem. Jurnal Ilmiah Teknik Sipil, 79–87.
  6. Hassan, H., Mangare, J. B., & Pratasis, P. A. K. (2016). Faktor-faktor penyebab keterlambatan pada proyek konstruksi dan alternatif penyelesaiannya (studi kasus : di manado town square III). Jurnal Sipil Statik Vol.4, 4(11), 657–664.
  7. Mahapatni, I. A. P. S. (2019). Metode Perencanaan dan Pengendalian Proyek Konstruksi. In UNHI Press.
  8. Molwus, J. J. (2014). Stakeholder management in construction projects: a life cycle based framework. Thesis. http://www.ros.hw.ac.uk/bitstream/handle/10399/2877/MolwusJJ_1014_sbe.pdf?sequence=1
  9. Proboyo, B. (1999). Keterlambatan Waktu Pelaksanaan Proyek : Klasifikasi dan Peringkat dari Penyebab-penyebabnya (Project Implementation Delay : Causes Classification and Ratings). Dimensi Teknik Sipil, 1(1), 49–58.
  10. Putra Agritama, R., Huda, M., & Setiyo Rini, T. (2018). Faktor-Faktor Yang Mempengaruhi Keterlambatan Proyek Konstruksi Di Surabaya. Jurnal Rekayasa Dan Manajemen Konstruksi, 6(1), 25–32.
  11. Rajablu, M., Marthandan, G., & Yusoff, W. F. W. (2014). Managing for stakeholders: The role of stakeholder-based management in project success. Asian Social Science, 11(3), 111–125. https://doi.org/10.5539/ass.v11n3p111
  12. Rantepasang, E. I. (2015). Pelaksanaan Proyek Di Sorong – Papua Barat.
  13. Sugiyono. 2003. Metode Penelitian. Bandung: Alfabeta.
  14. Sugiyono (2019). Statistika untuk Penelitian. Bandung : CV Alfabeta.
  15. Wirabakti, D. M., Abdullah, R., & Maddeppungeng, A. (2014). Studi Faktor-Faktor Penyebab Keterlambatan Proyek Konstruksi Bangunan Gedung. Teknik Sipil Universitas Agung Tirtayasa, Vol. 6, 15–29.