Abstract

The increasingly high development in Indonesia has spurred the number of construction service companies to increase. On the other hand, the increase in the growth of construction service companies has not been accompanied by a good atmosphere of construction implementation. As a result, delays in completing work have become commonplace in construction projects in Indonesia, the eastern part, and especially Papua. This research investigated the factors causing delays in completing construction work in Papua Province, especially in Merauke Regency. Questionnaires were distributed to contractors registered as members of GAPEKSINDO and domiciled in the Merauke district. The purposive sampling technique took the number of samples. The data analysis in this research used a Non-Parametric Statistical Test with Kendall's W analysis using SPSS 25.0 for the Windows program. The seven main factors that cause construction project delays are related to consultants. The test results show that the main factor of delay in construction projects in the Merauke Regency is the labor factor, with a mean rank value of 2.56. Factors that do not affect construction delays are other factors with a mean rank value of 5.28.

Keywords

Delay factors non-Parametric statistic Kendall’s W test

Article Details

Author Biography

Anggara Hutahaen, Departemen Teknik Sipil dan Lingkungan, Universitas Gadjah Mada, Yogyakarta, Indonesia

Perkenalkan saya Anggara hutahaean mahasiswa Pascasarjana Universitas Gadjah Mada 
jurusan Magister Teknik Sipil dan Bangunan dengan dosen pembimbing saya Bapak Arief Setiawan Budi Nugroho selaku dosen pembimbing pertama dan Bapak Muslikh sebagai dosen pembimbing kedua saya

How to Cite
Hutahaen, A., Budi Nugroho, A. S., & Muslikh. (2022). FAKTOR – FAKTOR KETERLAMBATAN PROYEK KONSTRUKSI DI PAPUA. Teknisia, 27(1), 1–11. https://doi.org/10.20885/teknisia.vol27.iss1.art1

References

Read More