Main Article Content
Abstract
Dili port is the one of port in Timor Leste, that can be used as  loading and unloading of goods. The increasing of operations in recent years was could be to the risk. The aim of this study was to analyze the risks involved in the operations of ships loading and  unloading in  port of Dili. This study was identifying risks, determine risk level, and risk mitigate that affect the  processes of  loading and unloading. Samples data were the  activities  loading and unloading that cause risks or accidents reported in 2010 to 2014. The data were analyzed using risk matrix method at probability (likelihood) and impact (consequence) based on AS/NZS 2004 standard. Using this method, there were 22 risk events do to identified . Using the risk matrix, injured due to exposure to the goods or sharp tools, which include a very high risk rating. This mitigate is to provide safety and health training  and  use to PPE (Personal Protective Equipment) to the labors.
Article Details
License
Authors who publish with this journal agree to the following terms:
- Authors retain copyright and grant the journal right of first publication with the work simultaneously licensed under a Creative Commons Attribution License that allows others to share the work with an acknowledgement of the work's authorship and initial publication in this journal.
- Authors are able to enter into separate, additional contractual arrangements for the non-exclusive distribution of the journal's published version of the work (e.g., post it to an institutional repository or publish it in a book), with an acknowledgement of its initial publication in this journal.
- Authors are permitted and encouraged to post their work online (e.g., in institutional repositories or on their website) prior to and during the submission process, as it can lead to productive exchanges, as well as earlier and greater citation of published work (See The Effect of Open Access).